Residential service

More space, built into
the house you already have.

An addition is part design, part feasibility. What you can build depends on the property, the existing structure and local requirements — which is why the first conversation is about whether it is possible, not about finishes.

What the work
covers.

  • Feasibility review of the property and existing structure
  • Room additions, extensions and enclosure of existing covered areas
  • Foundations, framing, roofing and exterior envelope
  • Structural connections to the existing house
  • Plumbing, electrical and HVAC extension into the new space
  • Interior finishing so the addition matches the rest of the home

How it works

From first call
to finished work.

  1. Tell us about the project

    Describe the work you have in mind, where the property is and what matters most to you. A short form or a phone call is enough to begin.

  2. Site visit

    We look at the property, take measurements and review the existing conditions. This is where what is possible gets separated from what is assumed.

  3. Written estimate

    You receive an itemized scope with material specifications or allowances, and a statement of what is excluded. It is free and carries no obligation.

  4. Permits, schedule and build

    Once the scope is agreed, permits are filed where required and the work is scheduled. One project manager coordinates the trades and keeps you informed.

Let’s talk about
your project.

Tell us what you have in mind. The site visit and the written estimate are free.

Useful to know

A few questions,
answered.

Should I add on, renovate, or move?

Start by identifying the space you are missing and whether a different layout could provide it within the current footprint. An addition adds floor area but depends on the property and local requirements. Compare scope, disruption and cost against moving before deciding.

How do I know whether an addition is even possible?

Lot dimensions, setbacks, the existing structure and local requirements all affect it. A site visit is the starting point, and some questions can only be answered once the municipality's requirements for your property are checked.

Does an addition need a permit?

Yes, and it will normally involve drawings, engineering and inspections. Ask what the process looks like for your municipality and how the timeline is affected.

Will the addition look like part of the original house?

That is a design decision made early. Rooflines, ceiling heights, window proportions and exterior finishes all determine whether an addition reads as original or as an obvious extension.

Can I stay in the house while an addition is built?

Often yes, because much of the work happens outside the existing envelope. The disruptive period is when the two structures are connected. Discuss this during the site visit.

How long does an addition take?

Longer than an interior remodel of the same size, because of design, permitting, foundations and weather. Ask for the expected stages and the assumptions behind them.

Can an existing patio or covered area be enclosed?

Sometimes, and it can be more economical than building from scratch. Whether the existing slab, structure and roof are suitable has to be assessed on site.

Will the HVAC handle the extra space?

Not always. Adding conditioned floor area can exceed the capacity of the existing system. Ask for this to be assessed rather than assumed.

How much does an addition cost?

It is driven by size, foundation and structural requirements, the roof, and how the new space is finished. It is priced after the property has been assessed and the scope defined.

How do I get an addition estimate?

Use the free estimate form or call +1 (561) 562-2318. Describe the space you need and where you are imagining it, and a site visit can be arranged.