Residential service
A bathroom that works
from the first hour of the day.
Bathrooms are small rooms with a lot behind the walls. Waterproofing, ventilation and drainage decide how well the room lasts, long after the tile selection has been forgotten.
What the work
covers.
- Layout changes, including converting a tub to a walk-in shower where practical
- Waterproofing, substrate preparation and tiling
- Vanities, cabinetry, mirrors and storage
- Plumbing fixtures, valves and drainage work
- Lighting, ventilation and electrical updates
- Glass, trim, paint and final fitting
How it works
From first call
to finished work.
Tell us about the project
Describe the work you have in mind, where the property is and what matters most to you. A short form or a phone call is enough to begin.
Site visit
We look at the property, take measurements and review the existing conditions. This is where what is possible gets separated from what is assumed.
Written estimate
You receive an itemized scope with material specifications or allowances, and a statement of what is excluded. It is free and carries no obligation.
Permits, schedule and build
Once the scope is agreed, permits are filed where required and the work is scheduled. One project manager coordinates the trades and keeps you informed.
More services
Everything else we
can take on.
Let’s talk about
your project.
Tell us what you have in mind. The site visit and the written estimate are free.
Useful to know
A few questions,
answered.
Can my tub be replaced with a walk-in shower?
Frequently yes, but drainage, floor structure and the position of existing plumbing decide how straightforward it is. Have the room assessed on site so the options and their cost implications can be explained.
What matters most in a bathroom remodel?
What you cannot see afterwards: waterproofing, the substrate under the tile, drainage falls and ventilation. Finishes are the visible part, but these determine whether the room holds up. Ask how each is specified in your scope.
How long will my bathroom be out of use?
It depends on the scope, on tile and fixture lead times and on inspection timing. Ask for the expected sequence during the estimate, and plan for the room to be unavailable for the whole of it.
Can you remodel more than one bathroom at a time?
Yes, and it is often more efficient when bathrooms share plumbing walls or the same finishes. Mention every room you are considering so the sequence can be planned together.
Do I need a permit for a bathroom remodel?
Usually when plumbing or electrical work is involved, though requirements vary by municipality. Ask which parts of your scope need a permit, who files it and how inspections are scheduled.
Can the bathroom be made more accessible?
Accessibility features such as curbless entries, wider doorways, seating and grab-bar blocking can often be planned in. Raise this early, because some of it has to be built into the structure rather than added later.
Will you handle mold or water damage found behind the walls?
Hidden damage is common in older bathrooms and cannot be priced before it is exposed. Ask how unforeseen conditions are handled in your agreement so there is an agreed process if something is found.
Who chooses the tile and fixtures?
You do, and the earlier the better. Selections affect lead times and the work sequence. Titanium can advise on what suits the room and confirm the specification in writing before ordering.
How much does a bathroom remodel cost?
Size, whether the layout or plumbing moves, and the tile, glass and fixtures you choose all change the figure. An estimate is prepared after the room has been measured and assessed.
How do I get a bathroom estimate?
Use the free estimate form or call +1 (561) 562-2318. Describe the room and what you want to change, and a site visit can be arranged.



